Basic Energy to build Pangasinan solar plant with Singapore partner Read more at http://www.mb.com.ph/basic-energy-to-build-pangasinan-solar-plant-with-singapore-partner/#5YrreAQIBREGrROM.99

March 30, 2016

manila_bulletinPublicly-listed firm Basic Energy Corporation has inked a deal with nv vogt Singapore Pte Ltd. for planned 10-megawatt peak (MWp) solar power developments in Pangasinan.

The targeted sites, according to Basic Energy, will be along its properties in San Fabian and Bolinao towns in the province.

A memorandum of understanding (MOU) was signed by the two firms on March 28, 2016 “for a joint interest in the development of solar power targeting a maximum of 10MWp per project.”

Aside from installations eyed in the two towns, the De Venecia-led firm hinted that other solar farm projects may also be pursued in sites that may be subsequently identified.

Basic Energy specified that “under the MOU, nv vogt Singapore Pte. Ltd. will conduct a due diligence study of the project, on an exclusive basis.”

This will be undertaken within 60 days from the singing of the propounded partnership arrangement.

The Singaporean firm is a solar power developer with investment focus in the Asian market, primarily the Southeast Asian region.

If ever, the solar developments to be pursued will be thriving in a post-feed-in-tariff regime, with the government sounding off that it is no longer inclined into having a third one after the second wave FIT due to be granted to qualified developers.

Source: http://www.mb.com.ph/basic-energy-to-build-pangasinan-solar-plant-with-singapore-partner/

Latest News

Basic Energy plans to deploy e-buses nationwide

The Basic Energy Corp. (BSC) is seeking government backing to roll out electric buses in every province across the country within the next five years. In a disclosure to the Philippine Stock Exchange, the BSC announced plans to get e-transport franchises for all 82 provinces with support from the Department of Transportation (DOTr) and the…

read more

Basic Energy eyes 168-MW wind project in Batangas

MANILA  -After winning a service contract from the Department of Energy (DOE), listed Basic Energy Corp. (BEC) will develop a wind project in Batangas province in the next five years in a goal to boost the Luzon grid’s generation capacity by up to 168 megawatts (MW). In a stock exchange disclosure on Friday, BEC said…

read more
View All Events