Basic Energy Corporation’s PT Energi Solusi Prepares for Production Testing in BES-6

October 2, 2014

fabianPT Energi Solusi a subsidiary of Basic Energy Corporation (PSE: BSC) reported that as of October 1, 2014, the fifth well (BES-5) has reached its total depth of 405 meters and wire logging of the well is now being readied. On the other hand, its sixth (BES-6) well has completed wire logging and preparation are ongoing for production testing.

In a disclosure to the Philippine Stock Exchange Thursday, 2 October 2014, BSC said the third well (BES-3) drilling operations are ongoing and has reached a depth of 393 meters.

Source: http://www.fabian.ph/2014/10/basic-energy-corporations-pt-energi-solusi-prepares-for-production-testing-in-bes-6/

Latest News

Basic Energy eyes 1-gigawatt RE portfolio by 2030

BASIC ENERGY CORPORATION, a listed company focusing on renewable energy (RE) and alternative fuels, aims to develop 500 megawatts (MW) of wind and 500 MW of solar energy projects by 2030, according to its chief executive officer (CEO). “In the next five years, [we aim] to build a portfolio of around 500 megawatts in wind…

read more

Basic Energy eyes 168-MW wind project in Batangas

MANILA  -After winning a service contract from the Department of Energy (DOE), listed Basic Energy Corp. (BEC) will develop a wind project in Batangas province in the next five years in a goal to boost the Luzon grid’s generation capacity by up to 168 megawatts (MW). In a stock exchange disclosure on Friday, BEC said…

read more
View All Events